1.)Lynne Robbins
2678 Poinsettia Dr. SD CA 92106
Email: lynne.beachhouse@icloud.com
Phone: 619) 884-9910
New windows and door
New French drain around entire raised foundation
New hardscape and redesign front yard
New concrete driveway with new layout
New concrete walkway and landing at side entry door
Paint entire interior of home
New tile floor in office

2.) Jen and Brian Wilderman
1470 Evergreen St. SD CA 92106
Email: jkwildebeast@yahoo.com
Repair areas of exterior cedar siding, replace areas as well
Place areas of 1x4 exterior trim
Paint entire exterior of home, two story
Install new drywall in garage, tape, mud, texture, prime and paint
Install new roll up garage door
Install all new interior doors and paint
Paint interior of home
Install new entry door and stain
Install new exterior laundry room door and paint

 

3.) Dr. Jim Jones-Residence 619-224-6914
1109 Alexandria St. San Diego, Ca.9107
Phase one remodel entire home-new cabinates,counter tops, move interior non-bearing walls, new doors and windows, plus two complete bathrooms. Phase two, build permitted master bedroom and bathroom addition. Designe by Full Phase Construction Co. and owner.

 

4.) Chuck and Anna Anderson 619-823-2426
2708 Nipoma St. San Diego, Ca.92107
Build 1,500 square foot garage with self contained living unit atop. Built per owners blueprints. Designed by Full Phase Construction Co. and owner. Job was permitted by city and was successfully completed.

 

5.) Tim and Marianne Daily 619-222-2043
4414 Brindisi St. San Diego, Ca.92107
Complete litchen and bathroom remodel. Both kitchen and bath were taken down to the studs and sub-floor. All new electrical, plumbing, cabinates, counter tops, windows, tile and granite. Exterior upgrades, stucco,facia boards,skylightys, roof.

 

6.) Joe and Kristie Inzunza 619-723-9100
1111 Devonshire Dr. San Diego,Ca.92107
Build new 4,500 square foot custom home. This house is now used by many to showcase in the Point Loma area. Job was started and completed in ten months due to scheduling expertise.

 

7.) Keith Danon,
2227 Garnett Av. Pacific Beach.

 Project: A 9 unit apartment complex. Major stucco repair and refinish with new finish coat, repair 60 lineal feet of foundation, install four new exterior doors, complete restoration of all exterior wood, prime and paint complete. This project took six weeks from start to finish while keeping nine tenants completely safe and thoroughly happy.

 

 8.) Mr. & Mrs. Seymour (858) 459-0097
6530 Manana Place La Jolla, Ca. 92037

 Project: Repair drain in hallway shower, re-grout shower 12” above shower floor. 180 lineal feet of termite repair to facia board, install new garage swinging door.

 

9.) Chris Harris: ((619)204-1888

Complete new 1920's replica bathroom. Build new carport attached to garage.